Sign In | Join Free | My udpf.com
China Beijing Silk Road Enterprise Management Services Co.,LTD logo
Beijing Silk Road Enterprise Management Services Co.,LTD
Beijing Silk Road Enterprise Management Services Co.,LTD Quality First, Hard Service!
Verified Supplier

4 Years

Home > Diesel Engine Assembly >

4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power

Beijing Silk Road Enterprise Management Services Co.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power

Brand Name : ISUZU

Model Number : 4JG1

Place of Origin : Japan

Price : Negotiated

Payment Terms : D/P, T/T

Supply Ability : 3 pieces

Delivery Time : 5 - 8 work days

Packaging Details : Neutral Package or Fumigation Free

Product name : Diesel Engine Assembly

Excavator model : SY75 - 8

Engine model : 4JG1

Condtion : New

Power : 48.5 kw

Type : Diesel engine

Color : Same as pictures

Material : Steel

Contact Now

4JG1 ISUZU Diesel Engine Assembly For Excavator SY75 - 8 Water Cooling

Specification

Car name: Complete Engine
Model Number: 4TNV98
Cylinder stroke: 107
Application: Excavator
Cylinder diameter: 95. 4
valve: 8 valve
Cooling: Water cooling
Output: 48.5kw
Injection: Direction
Cylinders of number: 4


Description

What is an engine assembly?
A cylinder block assembly and head assembly are described for use in an internal-combustion engine. They include: a closed-deck, cylinder block with a deck and first fluid chamber; and a cylinderhead disposed on the deck having a second fluid compartment; and a gasket interposed between the cylinder blocks and the cylinder heads.

How long does it take for a motor to be installed?
The shop time for a typical engine will be between 10 and 12 hours. A simple engine with a skilled mechanic may be quoted in as little as 8 to 12 hours. Larger jobs may take up to 15 hours.

How can I find out if I have an engine bloc?
A cracked engine block can be characterized by overheating, blue or gray smoke coming from the underside of the hood, and poor performance. Most often, the problem is caused by excessive heat due to low coolant, extreme temperature, or overburdening. You risk bursting a head gasket if you don’t resolve the problem quickly.

How long does it take for an engine to be installed in a car?
A typical engine will take between 10 and 12 hours to repair. A simple engine with a skilled mechanic may be quoted in as little as 8 to 12 hours. Larger jobs may take up to 15 hours. The majority of quotes should be given within the first hour.

How long does it take for a car engine to be put back together again?
Two weeks

How long does it take to put together an engine?
On average, we are 30 to 45 days behind. It takes 35 to 40 to build an engine (by the time parts get in, machining gets completed, all hand fittings, etc.).You can expect to be waiting between 70 and 90 days from start-to-finish.

4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power


Product Tags:

Diesel Engine Assembly 48.5kw

      

SY75-8 Diesel Engine Assembly

      

ISUZU 4JG1 Engine Diesel

      
Best 4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power wholesale

4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Beijing Silk Road Enterprise Management Services Co.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)